Will a park be built on part of the property?

    Yes, all of the property other than the affordable housing will be a Town park. This will total about 28 acres and be right next to Ephesus Park which is 12 acres. The type and content of the park will be discussed as part of the Parks & Recreation Comprehensive Master Plan.

    Why are the pond, trees and dam being removed?

    An engineering study conducted a few years ago classified the dam as being high risk, which means that the pond (and trees around it) must be drained and the dam replaced for safety. This area will be used for construction staging and stormwater and sediment capture during construction of the affordable housing then turned into a wetland.

    What is a constructed wetland?

    A constructed wetland uses natural processes to manage water. It helps by holding back water runoff, filtering out dirt and nutrients, and reducing the risk of flooding. It consists of different parts like basins, pools of water, wet soil areas, and edges with lots of native, non-invasive plants and animals.

    How many affordable housing units are planned?

    Right now, the Town's selected affordable housing developer plans to build 168 affordable units on the front 8-9 acres of the property.

    Can I use the American Legion building for an event?

    No, the American Legion building is closed to the public and it will eventually be demolished.

    Can I fish in the pond?

    You are allowed to fish in the pond but it’s at your own risk. The Town hasn’t tested the water quality or fish health.

    What will the pond area look like once removed and during affordable housing construction?

    The area that is a pond right now will feel like a construction site. We will install construction-type fencing to restrict access. Once complete, it will look like a large grass-seeded area. The dance studio will remain accessible until at least the affordable housing construction begins nearby. The Legion building parking will be unavailable for part of the demolition. The trails on the property (ie behind the dance studio connecting to Ephesus Park) will be open for the foreseeable future.

    Who is reviewing the Town’s plans to remove the pond and trees and replace the dam?

    The Town’s consultant engineer’s design plans have been reviewed by four entities:

    • Two divisions of the North Carolina Department of Environmental Quality, Erosion and Sediment Control and Dam Safety, which granted the required permits for removal and replacement of the dam outlet. At this time, the Town has received its Erosion and Sediment Control permit and is waiting on the Dam Safety Permit.
    • The Town’s Planning Department which granted a Zoning Compliance Permit after ensuring the plans follow the Town’s stormwater and other ordinances.
    • The US Army Corp of Engineers made a determination on the pond and whether it meets certain criteria.

    Is the pond a stormwater control measure today?

    While the pond does contain water, only about one acre of land drains to the pond when it rains heavily. Both today and during affordable housing construction, an outlet pipe sends overflow stormwater downstream. The Town’s consultant engineer has ensured through modeling that no additional water will leave the property than currently does, as required by the Town’s stormwater ordinance.

    Is there a spring that feeds the pond? If so, where will the spring water go after the pond is removed?

    The spring that could be feeding the pond will also drain to the new outlet pipe after the pond is removed. The Town’s consultant engineer has ensured through modeling that no additional water will leave the property than currently does, as required by the Town’s stormwater ordinance.